CURRICULUM VITAE

Name                       

Mr. Lindström Tomas


Day of birth

09 May 1982


Natioality

Swedish


Language

Swedish – Mother tongue

English – fluent in spoken and good in writing

Norwegian  - fluent in spoken and good in writing


Computer Skills

Very good knowledge: Officepackage, MS Project, Autocad, Undergroundmanager(Epiroc), iSURE(Sandvik)

Knowledge: Examine 2D & 3D, Flac, Microstation, MAP



Education/Qualification


1998-2001

High school natural technical line
Parkskolan, Örnsköldsvik, Sweden


2002-2007     

Master of Science in Civil Engineering, Soil and Rock Engineering

Luleå University of Technology, Sweden



03.01.2008

Heavy rock reinforcement of tunnels and caverns (TEKNA, NFF)


01.11.2009

Introduction to safety and environmental work (Rubicon bedriftshelse)


20.11.2012

Engineering Geology for construction managers in underground works (NTNU Videre)


05.02.2013

Course Handiloader SSE-equipment(Orica)


11.05.2015

Course in NS 8405 and NS 8406(EBA)


04.09.2015

(U1) Practical concrete technology - for production management, control manager, foreman / bas (TEKNA, NB)


15.10.2015

(S2) Shotcrete for rock support (TEKNA, NB)


10.05.2017

Course for Blasting manager Norway (MEF)


06.11.2017

Course for working near/on roads (Opplæring Vest)


04.05.2019

Course Tunneling 4.0: Information Technology for the design, construction of underground works (ITA-CET)


Other Qualifications


Military service

Gunner at a CV9040 on I5 in Östersund, 2001-2002 (10 months)


Driving license

Car


Certificate

Blasting manager in Norway (bergsprengningsleder)

Shotcrete controlleader in Norway

Work on road


Master thesis

Inverkan av fukthärdning och relativ fuktighet på sprutbetongens krympning                     

Work Experience


2020-

Consultant at FjellAS


- Feasibility and optimized drill & blast tunneling study for the ventilation tunnels at Los Bronces Under Ground “CASE B” for Anglo American (youtube link)


- Tender work tunneling and scheduling of the E39 Rogfast E03 project for CCCC Norway.



2018-2019

Project manager

YIT Norge AS, a hydropower plant with annual production of 163 GWh, 4 800 meter tunnels

with a 15 000m3 cavern for the powerstation, 400 meter raisboring with no road access. Etne, Norway

Responsible for client contact, staff, cost and schedule for the project.

Contract value: 32 million EUR



2017-2018

Project manager

Lemminkäinen Norge AS (YIT Norge AS) a 600 m long roadtunnel at Stadlandet, Norway

Responsible for client contact, staff, cost and schedule for the project.

Contract value: 8 million EUR



2015-2017

Tender manager

Lemminkäinen Norge AS, tender roadtunnels and

hydropowerplants in Norway between 5-100 mill EUR.



2014-2015

Site manager

Lemminkäinen Norge AS, 5 000 m3 cavern, shaft and niche for new ristgods handling in

the middle of the operative wastewater treatment plant (VEAS). Slemmestad, Norway.

Responsible for client contact, production, staff, HES- work, documentation and survey.

Contract value: 1,7 million EUR



2013-2014

Site manager

Lemminkäinen Norge AS, to rock caverns for Boliden Odda. The caverns are used for

deposition of sediments from the smelter. 60 meter high, 24 wide and 240 long. Odda, Norway

Responsible for production, staff, documentation and survey.

Contract value: 13 million EUR



2012-2013

Ass.Sitemanager

Implenia AS, Brokkeutbyggingen was a power development with 12 km tunnel,

powerhouse and a double curved 50-meter high dam for Otra kraft. Sætersdal, Norway

Responsible for production, documentation and survey.

Contract value: 55 million EUR



2010-2012

Ass.Site manager

Implenia AS, Pre-work for Fellesprosjektet E6-Dovrebanen two 500 meter accestunnels

to main railwaytunnel and 500 meter in maintunnel, Norway

Responsible for production, survey, documentation.

Contract value: 10 million EUR



2010-2011

Site manager/HES/Survey

Mika AS, 3400m transport tunnel for water (hydropower) for Elkem Saudafaldene, Norway

Responsible for production, staff, HES- work, documentation, and survey.

Contract value: 8 million EUR



2009-2010

Quality and HES and Survey responsible project

Mika AS, Øksendalsoverføringa is a 5,5 km water transport tunnel for hydropower, Norway

Responsible for HES- work, documentation and survey.

Contract value: 15 million EUR



2007-2009

Quality and HES (health, environment and safety) responsible project

Mika AS, 2,6 km road tunnel for securing from rockslide in Sogn og Fjordane, Norway

Responsible for HES- work, documentation and some surveying.

Challenges with powerful rock burst due to 1400 meter overburden.

Contract value: 17 million EUR



2005

7-months practice

Mika AS, Tunneling for railway at Botniabanan in the north of sweden.

Supervision and documentation.